Just when we thought work team season was over Chad, Kirk and I drove down to Kingston to spend a few days working with a volunteer group from Michigan who was willing to come and serve at our Kingston Campus.

The Michigan team giving us the thumbs up after a hard days work

One of the ladies I worked with pulling down the door jam to disassemble.
My first day was spent mostly working with ladies in the old little girls dorm that was flooded beneath at least 2 inches of water (that I have a suspicion was mixed with a lot of urine from the strong
smell we worked with). Our first task was to take down a kitchen that had been constructed... unscrewing walls, then taking off the top board, studs, then finally using a crow bar to lift of the wet yucky soft wood that was connected to the floor.

The floor and floor boards sitting in nasty urine water.
After the room was taken apart we then took the kid's wardrobe, and a cabinet to clean up, repaint, and make some repairs such as adding backs to them and re laminating the cupboard top. The second day I spent gluing white boards to ply wood so Kirk could frame them up, and from there went to gluing and putting together laminate on vanity tops that some of the work team guys made for the new little girls dorm. This team did great and a lot was accomplished, but there is still a lot of work that needs to be done before the kids come back on Sept 1st. Lots of painting and the floor needs to be tiled. If you could please pray for a well done and speedy completion that would be great. Have a great Night. I love you.
Be blessed and be a blessing
Erin